I-275 Reconstruction from Himes Ave. to Hillsborough River
Tampa, FL
Client:
Parsons Brinckerhoff / FDOT District 7
Location:
Tampa, FL
Size:
Length: 1.8 miles
Construction cost: $105 million
Service
Genesis CEI Services
Highlights:
Construction Engineering and Inspection
Scheduling
Utility Coordination
I-275 Reconstruction from Himes Ave. to Hillsborough River

This major project, through the heart of Tampa, Florida, consisted of multilane reconstruction of I-275 for a distance of 1.8 miles.
It included 10 bridges, 17 Mechanically Stabilized Earth (MSE) walls, major drainage improvements, asphalt and concrete pavement, highway lighting, signalization, Intelligent Transportation Systems (ITS), pavement markings, and extensive architectural features.
